Seismic Control and Isolation, Inc.

Code Compliant: Seismic Design, Consulting and Approved Materials

  • Home
  • Products
  • Seismic Engineering
  • Literature
  • Contact

Loos & Co. Installation & Training Videos

Posted by on May 11, 2009
Archive, Loos & Co., Inc.

Fire Sprinkler Installation: Main Line 2 Way Brace

Fire Sprinkler Installation: Branch Line 2 Way Brace

Fire Sprinkler Installation: Main Line/Junction  4 Way Brace

HVAC: Ductwork Installation

Electrical: Cable Tray Installation

Plumbing: Piping Installation

Loos & Co. General Information

Tags: Break Strength Certified, Color Coded, IBC, NFPA-13, Pre-Stretched, seismic sway bracing, Seismic Wire Rope/Cable™ Bracing

Search

Pages

  • Products
  • Seismic Engineering
  • Literature
  • Contact

RSS USGS M 1+ Earthquakes

  • M 1.9, Central Alaska
  • M 1.7, Southern California
  • M 1.9, Southern California
  • M 1.3, Southern California

Follow us Twitter Facebook

©2012 Seismic Control & Isolation, Inc.. All Rights Reserved.